Print Page | Contact Us | Report Abuse | Sign In | Join SEAONC
South Bay Dinner Meeting: Intuit's Marine Way Building
Tell a Friend About This EventTell a Friend
 

2/27/2019
When: 02/27/2019
5:15 PM
Where: Michaels at Shoreline
2960 N Shoreline Blvd
Mountain View, California  94043
United States
Presenter: Megan Stringer, SE, LEED AP BD+C
Contact: SEAONC
415-974-5147


Online registration is closed.
« Go to Upcoming Event List  

Intuit’s Marine Way Building

In the heart of Silicon Valley, Intuit, creator of Turbo Tax and QuickBooks, has a new kind of workplace. As part of the company’s headquarters, the new Marine Way Building (MWB) provides a sustainable, healthy, and interconnected work environment for Intuit. The four-story, LEED Platinum commercial office building has an array of amenities over its 185,400 square-feet—including one story of below-grade parking, a vast all-hands atrium space, “hanging” conference rooms, feature stairs, numerous terraces, and a green roof.

The post-tensioned concrete office building is unique in its trapezoidal shape, numerous large cantilevers, and 60-feet x 90-feet all-hands atrium space. To realize the architect’s desire for a flat soffit upturned beams were provided, where necessary, and to accommodate the 12-feet typical and up to 27-feet cantilevers on all sides of the building, careful implementation of post-tensioning was used in conjunction with cracked long-term deflection analyses. To meet the client’s desire for an open all-hands space, Holmes Structures implemented a 90-ft concrete encased steel truss, that supports the upper two stories of building, and allows for a column-free atrium space. Holmes Structures had to consider the constructability of the truss details as well as construction sequencing to ensure its successful installation. Holmes Structures also engineered a distinct blue feature stair that climbs across the atrium to connect three levels, improving the building’s circulation. Additionally, Holmes Structures accommodated discontinuous columns at the first floor with large (four-foot wide, three-foot deep) transfer beams; these allowed space for the necessary drive aisles below at the basement parking level.

This presentation will highlight the structural challenges for this project as well as highlight the lessons learned.

Project Team
Structural Engineer: Holmes Structures
Architects: WRNS Studio and Clive Wilkinson Architects
Contractor: Hathaway Dinwiddie Construction Company

 

Presenter:

 

Megan Stringer is a Senior Engineer at Holmes Structures in the San Francisco office. She has worked on numerous new commercial office and retail buildings. Megan is very active in SEAONC and currently serves as a director on the SEAONC Board. She is also a co-chair of the SEI Sustainability Committee.

 

 

Date: Wednesday, February 27th, 2019 // 5:15 PM: Registration // 6:00 PM: Dinner // 6:45 PM: Presentation
Location: Michaels at Shoreline, 2960 N Shoreline Blvd, Mountain View, CA 94043
Cost: Member: $39.00 // Associate: $33.00 // Non-member: $44.00

EVENT PHOTOS

2018-2019 Sponsors

Contact Us

Structural Engineers Association
of Northern California
575 Market Street Suite 2125
San Francisco, CA 94105
Phone: 415.974.5147
Email: office@seaonc.org

Mission: To advance the practice of structural engineering, to build community among our members, and to educate the public regarding the structural engineering profession.

Vision: A world in which structural engineers are valued by the public for their contributions to building a safer and stronger community.